Facility Profile: | 30-story office building in downtown Birmingham, AL |
---|---|
Equipment Served: | Two 850-ton Chillers; one 400-ton Chiller, and one Plate & Frame Exchanger |
Ec System Installed: | February 2012 |
Annual Make-Up Water Comparison
Base Year (2011): | 5,295,520 Gallons |
EC Controlled Year (2012): | 3,633,698 Gallons |
1st Year Water Savings: | 1,661,822 Gallons |
---|
Annual Chiller kwh Comparison
Base Year (2011): | 2,279,185 kwh |
EC Controlled Year (2012): | 1,910,888 kwh |
1st Year kwh Savings: | 368,297 kwh |
---|
Existing Side-Stream Filtering: | None |
First Year Savings Summary
% Water Saved:
31%
% kwh Saved:
16%
ROI:
30 Months